Project Details:
ATS were appointed to deliver the screed package at Frogston Primary School, Edinburgh, where an SR1 surface regularity specification was required.
An SR1 finish allows no more than 3mm deviation under a 2m straight edge, demanding precision across the entire slab.
- Area: 738 m²
- Specification: SR1
- Product: Hydroseal DPM x 2 coats, Flowcrete Isocrete 1500+ self-leveller
- Main Contractor: Henry Brothers
The Project
Following a full site survey, the slab was mechanically ground, vacuumed and primed with an epoxy scatter system to create a clean, controlled base.
Laser-set tripods ensured SR1 accuracy across the 738 m², while Flowcrete Isocrete 1500+ was mixed on demand via TransMix, with recipe and slump verified before pouring. Flowcrete visited site for quality checks.
Consistent screed batching allowed the full area to be completed in just 1 hour 15 minutes.
Let’s chat
Every project starts with a conversation – let us know about your project and we can talk through the details
Testimonial
“From the outset ATS maintained regular communication and dialogue. Arriving on site on the exact day and finishing within the time agreed. The quality of the finished product was to the highest standard and we look forward to working with ATS in the future.”
– Nick McKeown, Regional Director Scotland, Henry Brothers Limited
Gallery